Our work

Before & after project gallery

Completed projects with real budget ranges and timelines. Tap any image to switch between before and after.

After — Full roof restoration & repaint in Faerie Glen, Pretoria EastAfter

Roof Painting

Full roof restoration & repaint

Heavily faded concrete tile roof high-pressure cleaned, 40 broken tiles replaced, ridges re-bedded and finished in charcoal acrylic roof coating.

Location
Faerie Glen, Pretoria East
Investment
R22 000 – R28 000
Duration
4 days
After — Flat roof torch-on waterproofing in Eldoraigne, CenturionAfter

Waterproofing

Flat roof torch-on waterproofing

Failed membrane stripped, falls corrected with a new screed, outlets re-detailed and a reinforced torch-on system installed with a 10-year guarantee.

Location
Eldoraigne, Centurion
Investment
R18 000 – R24 000
Duration
3 days
After — Double-storey exterior repaint in Carlswald, MidrandAfter

Painting

Double-storey exterior repaint

Full wash-down, crack repair and re-plastering, then two coats of premium exterior acrylic with all trim, fascias and steelwork refinished.

Location
Carlswald, Midrand
Investment
R38 000 – R46 000
Duration
7 days
After — Tile-to-IBR re-roofing project in Wonderboom, Pretoria NorthAfter

Roofing

Tile-to-IBR re-roofing project

Aging tile roof stripped, structure reinforced and re-braced, new insulation and sisalation installed, finished in charcoal IBR sheeting with new gutters.

Location
Wonderboom, Pretoria North
Investment
R95 000 – R120 000
Duration
12 days
After — Kitchen & open-plan renovation in Bryanston, SandtonAfter

Renovations

Kitchen & open-plan renovation

Wall removed with a new structural beam, services re-routed, new bulkhead ceiling, cabinetry, engineered stone tops and full electrical upgrade.

Location
Bryanston, Sandton
Investment
R180 000 – R240 000
Duration
6 weeks
After — Large-format porcelain flooring in Highveld, CenturionAfter

Tiling

Large-format porcelain flooring

Old tiles lifted, floor levelled with self-levelling screed and 1200x600 rectified porcelain laid throughout the living areas with minimal grout lines.

Location
Highveld, Centurion
Investment
R42 000 – R55 000
Duration
8 days
After — Interlocking driveway & walkway in Akasia, PretoriaAfter

Paving

Interlocking driveway & walkway

Old cracked concrete demolished, engineered sub-base compacted, channel drain installed and herringbone paving laid with cast concrete edge restraints.

Location
Akasia, Pretoria
Investment
R48 000 – R62 000
Duration
6 days
After — Townhouse complex maintenance in Halfway Gardens, MidrandAfter

Maintenance

Townhouse complex maintenance

Scheduled contract covering gutter clearing, roof and waterproofing inspection, common-area repairs and a photographic report to the trustees.

Location
Halfway Gardens, Midrand
Investment
R12 000 – R18 000 / visit
Duration
Quarterly

Ready to start your project?

Get a free on-site inspection and a fixed written quotation — usually within 24 to 48 hours.